
Press kit
Game Dev Dynasty at a glance
Official facts and final campaign assets for journalists, creators, and event organizers.
Play the demo on SteamQuick facts
- Title
- Game Dev Dynasty
- Developer & publisher
- Boot Phase Games
- Genre
- Studio management tycoon
- Planned platforms
- Steam for Windows and macOS
- Demo
- Free demo available now
- Status
- Free demo available now; full game in development
- Planned release
- November 16, 2026
- Mode
- Single-player
- Career
- One connected studio career from 1995 to 2019
Short description
Create the game of your dreams in this studio management tycoon. Design game covers, lead your team and compete in a living market. Outsell rivals, win Game of the Year, and build the most prestigious game studio in the world.
Boot Phase Games is an independent game studio focused on systems-rich games where expressive builds, clear decisions, and long-term consequences remain connected.
Demo
Play from January 1995 through the end of 1998. Make and release games, move into your first Small Office, and hire up to two employees. The full game continues the career through 2019, with larger studios and later hardware generations.
Approved campaign assets
Complete download
Game Dev Dynasty press kit
A fact sheet, creator and asset usage guidelines, official game and studio logos, crown emblem, Steam main capsule, gameplay trailer, trailer poster, and eight full-resolution gameplay screenshots.
Curated final campaign assets only; no internal production material is included.

Official studio logo
Download original ↓
Gameplay screenshot
Download original ↓
Official crown emblem
Download original ↓
Steam main capsule
Download original (.zip) ↓
Gameplay trailer
Watch gameplay Download original (.mp4) ↓Gameplay trailer
See a career take shape
Watch authentic gameplay from the first project decisions through production, launch, rival studios, and the chase for world rank #1.
Streaming and video policy
You may record, stream, and upload video of Game Dev Dynasty and its demo on any platform — YouTube, Twitch, TikTok, Bilibili, Niconico, Kick, and others — and monetize it however that platform allows: ads, subscriptions, memberships, Super Chat, gifts, and donations. This applies to individuals, companies, MCNs, and VTuber agencies alike, and you do not need to ask us first. Clips, compilations, and thumbnails using our logo and screenshots are fine.
You may include in-game music and sound in gameplay videos and streams. This permission does not cover distributing the soundtrack or sound effects on their own.
We only ask that you do not use the game in hateful or illegal content, and do not imply that we endorse or sponsor you. A link to the Steam page is appreciated.
Last updated: October 13, 2026
Press contact